Solution
The Forbes Marshall team conducted a study of the process
and following changes were made with products from Forbes
Marshall as per recommendation
Replacement of:
- Existing coal fired boiler with 1TPH rice husk fired boiler
with air pre heater
- All existing traps with thermodynamic traps
Installation of:
- Pressure reducing station for stable steam pressure
- Moisture separators and strainers for all steam lines
- G-trap in each of the 80 irons
- Complete flash and condensate recovery system
consisting of flash vessel, pressure powered pump
packaged unit (PPPPU) and deaerator head for 100% CRF
- SteamMon steam flow meter to measure and monitor
steam consumption