Optimising Condensate and Flash Steam Recovery System

Customer: A leading tyre manufacturer in Thailand

The plant was recovering condensate using a conventional electrical pump, which sustained damage due to the high temperature of condensate. Additionally, the flash steam was being entirely vented to the atmosphere from the collection tank. This was adversely affecting the plant’s energy efficiency.

Forbes Marshall engineers conducted a thorough audit of the system and implemented a comprehensive solution. The Condensate Recovery System (CRS) was redesigned and the conventional centrifugal pump and collection tank was replaced with a flashjet pump (FJP). This enabled the plant to recover all energy from flash steam and condensate, even at high temperatures. The improvements enhanced safety, maintained a clean workspace, optimised energy efficiency, and ensured operational reliability.

Fuel Saved


250,800 Kilograms/Year

Water Saved


1,435.5 Kilolitres/Year

CO₂ Reduction


631,700 kilograms/Year

Annual Monetary Savings


28,000 USD

What to read next

Associated Services

Process Optimization

Process Optimization

Arrow
Improving Uptime

Improving Uptime

Arrow
Forbes Marshal Digital

Forbes Marshal Digital

Arrow