Debottlenecking PET Line Warmer and Improving Condensate Recovery

Customer: A leading beverage manufacturer in Thailand

The plant was struggling to achieve the required temperature in the PET line Warmer, Forbes Marshall engineers conducted a thorough evaluation. We observed that the steam trap outlet temperature was only 50°C, indicating stalling in the heat exchanger. This was caused by incorrect steam trap selection and a 15-metre lift in the condensate line after the trap. The Condensate Recovery System (CRS) was also compromised, leading to further inefficiencies.

We implemented a holistic solution that addressed these problems. This involved selecting a steam-operated pump trap, eliminating the lift in the condensate line, and using a steam-powered pump to transfer condensate to the boiler feed water tank. These measures resolved the temperature issues in the warmer, improving its overall efficiency and enabling the plant to recover 100% of the condensate from the equipment.

Steam Reduction


209,000 Kilograms/Year

Fuel Saved


15.47 Kilolitres/Year

Water Saved


2,396 Kilolitres/Year

CO₂ Reduction


45,492.2 Kilograms/Year

Annual Monetary Savings


10,300 USD

What to read next

Associated Services

Process Optimization

Process Optimization

Arrow
Improving Uptime

Improving Uptime

Arrow
Forbes Marshal Digital

Forbes Marshal Digital

Arrow