Optimising steam system efficiency at an FMCG manufacturer

The plant had opportunities for improvement in condensate recovery, Feed Water Temperature (FWT), and flash steam recovery. These areas were leading to increased boiler fuel consumption. Forbes Marshall engineers conducted a detailed analysis and implemented a comprehensive solution that optimised condensate recovery, recovered and utilised previously vented flash steam, and successfully raised feed water temperature to optimal levels.

Benefit

BENEFITS

  • Fuel Saved: 1.5% per Annum
  • Water Saved: 736 Kilolitres/Year
  • CO₂ Reduction: 106,000 Kilograms/Year
  • Annual Monetary Savings: 19,300 USD

What to read next

Associated Services

Process Optimization

Process Optimization

Arrow
Improving Uptime

Improving Uptime

Arrow
Forbes Marshal Digital

Forbes Marshal Digital

Arrow